Request a Quote
Request a Quote

2HL-10HL Nano Brewery Equipment

2HL-10HL Nano Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment

800L Brewery Equipment



Product Paramenters


ModelZR-800
Production800L/Batch,Up to 3 batches/day
CapacityEffective volume: 800L
MaterialSUS304   SUS316   Red copper 
Combination method2-Vessel   3-Vessel   4-Vessel   5-Vessel 
ApplicationRestaurant   Bar   Hotel   Brewery 
Heating wayElectric heating   Steam heating   Direct fire heating 
Control SystemFully automated with PLC Siemens   Semi-Automated with PID Schneider 
VoltageThree-phase/380(220, 415,480…)v/50(60)Hz   Single phase/220(110, 240…)v/50(60)Hz 
power25KW
Water Consumption4.8T
floor space50-70 ㎡
Note:1Barrel (BBL) =117 Liter      1Hl=100 Liter     1Gallon=3.7854 Liter

Advantage of Configuration



▶ 2-vessel brewhouse can achieve 3batches of brewing per day, laying a good foundation for the expansion of production

▶  Mixing unit for better mixing of grain and water

▶ The liftable scraper cooperates with the pneumatic gate valve to automatically discharge the waste;

▶ Filter tank up to 8mm thick flat bottom and stainless steel square tube support, strong and stable

▶ The wort loop pipe with multiple branch pipes to collect the wort more evenly;

▶ The backwash loop pipe with multiple branch pipes to solve the difficulty of filtration;

▶ Specially designed steam jacket device to improve steam utilization efficiency and avoid "water hammer" problem

▶ Special tank and pipeline structure to avoid wort aeration problem and reduce material loss

▶ The boiling process can be carried out under pressure, especially for breweries at higher altitudes.

▶ Specially designed steam condensing unit with both steam condensing and hot water recovery functions

▶ Reserve the cooling capacity and pipeline interface for future expansion;

▶ Fully automatic control system: an automatic system with curve display and production record printing, which can store and recall a series of recipes, and complete the brewing process with one key;


800L Nano Brewery Standard Configuration


 

Malt Milling Unit

▶ Grist case

▶ Particles adjustable counter-roll dry crusher or wet crusher

▶ Flexible or steel auger lifts milled grain directly to the mash bucket

 

Brewhouse System

▶ Mash /lauter tun, kettle / whirlpool tun 2-vessel combination;

▶ Two-stage or single-stage heat exchanger for wort cooling;

▶ Wort oxygenation device before entering the fermenter;

▶ Hygienic and high-efficiency mash pump with frequency conversion

▶ Sanitary stainless steel pipes and valves

▶ Quick-install and fully detachable stainless steel operating platform

▶ Special combination of brewing water tank, hot water tank and cold water tank can be selected

 

Fermentation System

▶ Stainless steel fermentation tank with cooling jacket

▶ Stainless steel bright tank or storage tank with cooling jacket

▶ The quantity and volume of fermentation tanks are accurately calculated by the fermentation cycle of various beers

▶ All orifices, valves, pressure gauges, safety valves, temperature probes, rotating arm beer outlet and other accessories are included

▶ Unitanks with carbon dioxide charging device with carbon fossil

▶ PPR pipes and stainless steel pipes with thermal insulation layer are available;

 

Glycol Cooling System

▶ Insulated glycol tank for glycol liquid holding and mixing

▶ The chiller or refrigerator is accurately calculated the cooling capacity according to the needs of heat exchanger and fermentation system

▶ Sanitary centrifugal pump powering glycol water circulation

▶ Other more energy-efficient options, such as adding a cold water tank

 

CIP Cleaning System

▶ A removable CIP cleaning system including lye tank and acid tank is available;

▶ Fixed CIP cleaning system including lye tank, acid tank and hot water tank is available;

▶ Simple mobile pump is available;

 

Control System

▶ PID semi-automatic control with temperature display, setting and control and pump start-stop control is available;

▶ PLC automatic control is optional; it has temperature, flow, liquid level display and control, accurate metering of feeding water and automatic mixing, editing and storage of recipes and one-key completion of the brewing process;


800L Nano Brewery Optional Configuration



▶ Water treatment device for brewing water

▶ Gas or electric boilers for providing thermal energy;

▶ Filter press instead of filter tank;

▶ Waste grains conveying device with auger and grains storage tank

▶ Yeast culture system and yeast recovery system;

▶ Air compressor

▶ Tunnel pasteurization system or instant sterilization system;

▶ Packaging system for beer kegs, beer bottles and cans;

▶ Removable diatomaceous earth filter

▶ Tube sheets for centralized valve operation;


Model/Specification



ItemProduction capacity(L)Power(KW)Water consumption(T)Floor space(㎡)Roof height(mm)
ZR-500500L/BatchElectric heating:55KWSteam / direct fire heating:10KW2.940-603000
ZR-600600L/BatchElectric heating:60Steam / direct fire heating:15KW3.640-603200
ZR-700700L/BatchElectric heating:65Steam / direct fire heating:20KW4.250-703200
ZR-800800L/BatchElectric heating:70Steam / direct fire heating:20KWSteam / direct fire heating:4.850-703200
ZR-10001000L/BatchElectric heating:80KWSteam / direct fire heating:25KW670-1203500
ZR-15001500L/BatchSteam / direct fire heating:130KW9100-2004100
ZR-20002000L/BatchSteam / direct fire heating:140KW12150-2504400
ZR-25002500L/BatchSteam / direct fire heating:150KW15180-3004900
ZR-30003000L/BatchSteam / direct fire heating:200KW18200-3504900
ZR-50005000L/BatchSteam / direct fire heating:300KW30400 and above6000


What factors need to be considered when choosing a set of bar beer brewing equipment

A:

1. The consumption of beer
2. Site conditions
3. Estimated investment
4. Types of winemaking
5. Daily brewing batches
6. Brewing process
7. Wine selling equipment
8. The aesthetics of the equipment

How to use your beer brewing equipment?

A:

ZR BREW have paper instructions in English, and we will teach till you do it well.

What is your payment term?

A:

1. T/T transfer, 40% advance payment for start production, after paying 60% balance payment for shipping. 2. Paypal or trade assurance is available.

How long is the delivery time of your fermenter?

A:

Usually the lead time for fermenter tank is 30 working days, while the lead time for complete brewery project is 40 working days, timed from final drawing confirmed

Do you provide after-sales service?

A:

Yes,ZR BREW could provide after-sales service.We have many professional engineers, they can go to your place and teach your person installation and brewing.

TAGS beer brewing system/ beer brewing equipment/ beer brewery equipment / beer brewhouse/ microbrewery system equipment/ beer making system/ commercial beer system/ beer brewing factory system/ beer brewing room system/ craft beer making equipment

Shandong Zeren Machinery Equipment Co., Ltd. is an equipment manufacturer focusing on biological fermentation industry

Contact Us
  • >> Tel: +86 531 68659350
  • >> E-mail: emma@zrbrew.com
  • >> WhatsApp: +8613188932181
  • >> Tel/WeChat: +86 131 8893 2181
  • >> Office address: Room 413, Tongyuan Building, Yingxiu Road, High-tech Zone, Jinan City, Shandong Province
Request a Quote

Copyright © Shandong Zeren Machinery Equipment Co., Ltd. All Rights Reserved | Sitemap | Technical Support: Shandong Zeren Machinery Equipment Co., Ltd.