1200L Stainless Conical Fermenter is manufactured by ZR BREW,we can customize beer fermentation tanks of different specifications according to customer needs. All fermentation tanks are made of certified 304 or 316 stainless steel materials and components, 100% TIG welding and hygienic polishing,to ensure food hygiene level, and strictly undergo strict production process Quality control, inspectionp; and pressure testing, form detailed inspection records, and send out with the goods. ZR BREW guarantees free delivery of all valves and fittings.
Product Paramenters
Interior | Jacket | |
Material | SUS304 | SUS304 |
Working pressure (Mpa) | 0.2 (30psi) | 0.2(30psi) |
Design pressure (Mpa) | 0.3 (45psi) | 0.4 (60psi) |
Effective volume | 1200L | |
Total volume | 1500L | |
Tank Size (mm) | Ø1360*1550 | |
Cooling meth | Glycol water cooling | |
Insulation material | Polyurethane | |
Insulation thickness(mm) | 80 | |
Inter tank thickness (mm) | 3.0 | |
Outer tank thickness(mm) | 2.0 | |
Cone angle | 60° | |
Note:1Barrel (BBL) =117 Liter 1Hl=100 Liter 1Gallon=3.7854 Liter 145psi=1MPa |
Details Images
Mechanical PRV | Sample Valve | Pressure Manhole | Racking Arm | Thermometer |
Titanium Rods | Temperature Sensor | Solenoid Valve | Welding Detail | Sewage Port |
1200L Stainless Conical Fermenter standard configuration
Dished and conical head are available
Pressure side manhole door
TC connected CIP arm with 360° coverage spraying ball
Sanitary sample valve
Mechanical safe valve PVRV 2 bar on top
Diaphragm pressure gauge on CIP arm
Horizontal rotating racking arm and port on cone with butterfly valve
Tri clamp discharge arm with butterfly valve
Dry hopping port 4-6'' TC with solid end cap
Thermowell for high accuracy temperature sensor
4pcs completely SUS304 heavy duty legs with leveling pad and legs support
Complete valves, fittings and all parts
100% TIG welding with pure argon gas shield
Interior Finish: Sanitary 2B finish, Pickled and Passivated; (8K Mirror finish optional)
Exterior Finish: Oil brushed finish(2B, 8K Mirror finish optional)
Interior full polished to 0.2~0.4 μm without dead corner
Glycol Jacket: Dimpled plate on cone and side
1200L Stainless Conical Fermenter optional configuration
Separate blow-off pipe & CIP
Carbonation stone for CO2
Display temperature gauge in front
Liquid level display on the sidewall
Advantage of configuration
For easy yeast excretion, designed with a 60° cone angle
Polishing/drawing/mirror finish/pickling passivation optional
Shadowless manholes or top manholes depending on the customer's fermentation process and brewing type.
The headspace is larger, and the covering headspace volume is calculated separately and additionally.
Jacket test by water and gas, 5bar/75psi for 1hour, 3.5bar/52psi for 48 hours,Tank leakage test by water and gas, 4bar/60psi for 1hour, 2.5bar/37.5psi for 48 hours,all data will be recorded to facilitate strict quality control and management
Easy to operate with dedicated ladder
For easy lifting, it is equipped with lifting lugs.
For flexible conveying of beer, it is equipped with a swivel rocker
To ensure tank alignment and leveling, it is equipped with adjustment bolts
Specifications and models
Sepcification selection | Total volume(L) | Cooling ares(m2) | Diameter(mm) | Height |
ZR-FV-100 | 125 | 0.86 | 650 | 1500 |
ZR-FV-200 | 250 | 1.3 | 850 | 1600 |
ZR-FV-300 | 375 | 1.9 | 860 | 2000 |
ZR-FV-400 | 500 | 2.1 | 960 | 2000 |
ZR-FV-500 | 625 | 2.2 | 960 | 2200 |
ZR-FV-1000 | 1250 | 3.4 | 1260 | 2600 |
ZR-FV-1500 | 1875 | 4.5 | 1460 | 2850 |
ZR-FV-2000 | 2500 | 5.4 | 1600 | 3100 |
ZR-FV-2500 | 3125 | 6.0 | 1800 | 3400 |
ZR-FV-3000 | 3750 | 6.7 | 1800 | 3600 |
ZR-FV-4000 | 5000 | 7.6 | 1900 | 4000 |
ZR-FV-5000 | 6250 | 8.5 | 2200 | 3800 |
Our service
Pre-sale service : | After- sale service: |
1. Free turnkey beer brewing/filling/packaging solutions. | 1. Perfect packaging and transportation, all the tanks are wrapped by three layers of PE protective film, the nozzles are blocked by dust caps, the spare parts are sealed in wooden boxes, the whole loading process is recorded by photos, and accompanied by a checklist, sent to you together. |
2. The technical team with 13 years of experience in the beer brewing equipment industry, one-to-one service, provides different brewing process according to your requirements. | 2. Complete installation and commissioning services, providing detailed installation instructions in English or French, online video-guided installation and offline door-to-door installation. You can choose between two installation and commissioning modes. We are also establishing technical service teams around the world, so that you can look back worry-free. |
3. According to your site, carry out overall project planning and provide two-dimensional and three-dimensional layout drawings. | 3. Lifetime warranty and technical consultation. |
Project Case
Why choose ZR BREW
Shandong Zeren Machinery Equipment Co., Ltd. referred to as ZR BREW.ZR BREW is an equipment manufacturer
focusing on the biological fermentation industry, mainly engaged in beer brewing equipment, providing high-end
comprehensive services of product design, production, processing, installation, technical process training. ZR BREW's
products have been exported to more than 40 countries and regions in the world. Mainly concentrated in Europe and
North and South America.
ZR BREW Company is located in Jinan City, and the factory is located in Dezhou City, covering an area of 10,000
square meters. The company has 52 employees, including 6 senior technicians and 8 intermediate technicians, with
more than 20 undergraduates. Project leaders and technical engineers have more than 13 years of work experience
in the beer industry.
Our factory
Our Team
Certifications
How to control the temperature of the fermenter
The PLC or digital displayer is connected to the PT100 temperature sensor installed on the tank through the signal line to control the temperature.
How to use your fermenter?
ZR BREW have paper instructions in English, and we will teach till you do it well.
What is your payment term?
1. T/T transfer, 40% advance payment for start production, after paying 60% balance payment for shipping. 2. Paypal or trade assurance is available.
How long is the delivery time of your fermenter?
Usually the lead time for fermenter tank is 30 working days, while the lead time for complete brewery project is 40 working days, timed from final drawing confirmed
Do you provide after-sales service?
Yes,ZR BREW could provide after-sales service.We have many professional engineers, they can go to your place and teach your person installation and brewing.
Shandong Zeren Machinery Equipment Co., Ltd. is an equipment manufacturer focusing on biological fermentation industry
Copyright © Shandong Zeren Machinery Equipment Co., Ltd. All Rights Reserved | Sitemap | Technical Support: